CONSTRUCTION MOBILISATION READINESS REVIEW Construction Safety Desk | Updated 23 October 2026 Project: Location / applicable jurisdiction: Reviewer / role: Review date: Proposed start date: Scope / work packages: For each prompt, record the evidence checked, its limitations, any missing information, the action owner, due date and the affected work or hold point. 1. ROLES AND SCOPE Are client, designer and contractor roles clear? Where applicable, are the principal designer and principal contractor appointments confirmed? 2. PROJECT INFORMATION Are the relevant surveys, drawings, design decisions and site constraints available for the planned work? Which areas or activities are excluded? 3. CONSTRUCTION PHASE PLAN Is the plan proportionate to this project, with responsibilities, coordination, site rules, welfare and emergency arrangements that can be implemented? 4. PEOPLE AND WORK PACKAGES Have capability, supervision and task information been checked against the actual work? Are RAMS comments and interfaces resolved before affected work? 5. SITE ARRANGEMENTS Are access, segregation, deliveries, welfare, security and emergency interfaces ready? Who will check the physical arrangements on site? 6. OPEN ACTIONS AND CHANGES What remains unresolved? Who decides whether affected work can start? How will changes be communicated and the plan kept current? ACTION RECORD (repeat for each issue) Finding: Evidence checked / revision: Affected work: Required action / competent input: Owner: Due date: Restriction or hold point: Closeout evidence: Decision / reason / person / date: Next review: This is a blank review aid, not a completed construction phase plan, statutory inspection or permission to start work. Adapt it to the project and current requirements. A remote document review does not verify physical site conditions or replace dutyholder decisions, competent site management or specialist input. CDM 2015 references apply to Great Britain; Northern Ireland has separate rules. Guidance: https://constructionsafetydesk.co.uk/cdm-support Official source: https://www.hse.gov.uk/construction/cdm/2015/principal-contractors.htm