PRE-CONSTRUCTION INFORMATION PACK INDEX Construction Safety Desk | Working structure | 17 October 2026 Project: ____________________ Prepared by / role: ____________________ Issue date and revision: ____________________ Recipients and purpose of issue: ____________________ For each relevant item record the document reference, revision/date, source, limitations, owner and outstanding action. Mark items not applicable with a reason. 1. Project brief, location, scope, programme and phasing 2. Dutyholders, appointments and communication routes 3. Existing drawings, asset information and previous health and safety file 4. Relevant surveys and exclusions affecting the work 5. Services, access, boundaries, neighbours and occupied areas 6. Significant design risks, assumptions and sequencing constraints 7. Coordination, approvals, change and emergency interfaces 8. Welfare and site logistics information 9. Health and safety file handover requirements 10. Information-gap register and hold points OPEN ISSUE Missing information: ____________________ Affected work / decision: ____________________ Responsible person and next action: ____________________ Needed by: ____________________ Hold point and status: ____________________ Populate this structure with project-specific information. It is not a completed PCI pack, a CPP or approval to proceed. Keep status and limitations visible and resolve information needed for safe decisions before the affected work. General Great Britain CDM guidance; Northern Ireland has separate rules. Guide: https://constructionsafetydesk.co.uk/guides/pre-construction-information-checklist Official guidance: https://www.hse.gov.uk/pubns/priced/l153.pdf