SMALL BUILDING SITE SAFETY ACTION SHEET Construction Safety Desk | Planning aid | 17 October 2026 Project / location: ____________________ Date and reviewed by: ____________________ Work planned and change since last review: ____________________ For each relevant prompt record the finding and action. This is not a compliance score or permission to start work. [ ] Client, scope, CDM role and coordination understood [ ] Relevant surveys and limitations reviewed [ ] Construction phase plan and task method reflect the work [ ] Boundaries, public protection, access and deliveries considered [ ] Work at height, excavations, structures and services addressed [ ] Dust, substances and other health risks controlled [ ] Suitable people, supervision and equipment arranged [ ] Required inspections and briefings current [ ] Welfare, first aid and emergency arrangements accessible [ ] Changes and open actions assigned to responsible people ACTION RECORD (repeat for each issue) Finding / missing information: ____________________ Activity affected: ____________________ Action and responsible person: ____________________ Due date: ____________________ Must affected work wait? Decision by: ____________________ Evidence of closeout / date: ____________________ Review actual site conditions and all requirements relevant to the work. This sheet does not set statutory inspection intervals or replace specialist assessments, site management or worker consultation. General Great Britain guidance; Northern Ireland has separate rules. Guide: https://constructionsafetydesk.co.uk/guides/small-builder-health-and-safety-checklist Official guidance: https://www.hse.gov.uk/construction/areyou/builder.htm