Principal contractor duties under CDM 2015
The principal contractor coordinates the construction phase where a project involves more than one contractor. The appointment is not simply a name on the construction phase plan: it requires active planning, management, monitoring and coordination of the work.
Reviewed 14 September 2026 · By Lloyd GodsallWhen is a principal contractor required?
Where a construction project involves, or is likely to involve, more than one contractor, the client must appoint a principal contractor in writing. The appointment should be made as soon as practicable and before the construction phase begins. On a single-contractor project there is no principal contractor; the contractor carries the relevant construction-phase planning duties.
Core principal contractor duties
The principal contractor must plan, manage, monitor and coordinate health and safety during the construction phase. In practical terms, that means establishing arrangements that work across the project rather than checking each contractor in isolation.
- Liaise with the client and principal designer and use relevant pre-construction information
- Prepare, implement and keep the construction phase plan under review
- Organise cooperation between contractors and coordinate their work
- Check that appointed contractors have the necessary skills, knowledge, experience and organisational capability
- Provide suitable site inductions and project information
- Take reasonable steps to prevent unauthorised access
- Provide and maintain suitable welfare facilities from the start
- Consult and engage workers on matters affecting their health, safety and welfare
- Provide suitable site-specific rules, supervision and management arrangements
What should the evidence look like?
The evidence should follow the decisions being made. Useful records may include appointments, project and design-risk reviews, competence checks, the live construction phase plan, contractor RAMS reviews, inductions, coordination meetings, inspections, worker consultation, change controls and closeout of actions. Large volumes of disconnected paperwork are not a substitute for control.
A useful assurance test
Can the project show who is coordinating each significant interface, what information they used, what was decided, who owns the action and whether the control is working on site?
Common gaps to look for
- The principal contractor is appointed late or the role is unclear
- The construction phase plan is generic or is not updated as the work changes
- Contractor RAMS are collected but interfaces between trades are not coordinated
- Temporary works, design changes or services information have no clear control route
- Inductions describe rules but do not address the project-specific risks
- Welfare, public protection, traffic or emergency arrangements are left until mobilisation
- Workers are briefed but there is no meaningful route for consultation or feedback
- Inspections identify issues without named actions, deadlines or verification of closeout
Official guidance
HSE summarises the principal contractor role and the wider CDM dutyholder responsibilities in its CDM 2015 dutyholder summary. The supporting legal guidance is Managing health and safety in construction (L153).
For help reviewing the project arrangements, see CDM support and the construction phase plan guide.