Health and safety support for groundworks and civil engineering

Construction-led support for excavation, services, plant movements, lifting, temporary works and the changing interfaces that make civil engineering difficult to capture in generic paperwork.

Discuss your requirements
Plan the changing site

Make the sequence, ground risk and interfaces clear.

Civil works evolve quickly. Access routes move, excavations deepen, weather changes ground conditions and several work fronts can interact. Good planning identifies what must be surveyed, designed, inspected or authorised before each stage begins.

  • Excavation, trench support and buried-service controls
  • Plant-pedestrian segregation, deliveries and lifting interfaces
  • Temporary works responsibilities and design hold points
  • Ground conditions, dewatering, contamination and spoil management
  • Public highways, traffic management and neighbouring activities
  • Reinstatement, inspection and handover evidence

See the construction phase plan guide and our retained safety desk.

Information gaps

Record missing surveys, services, temporary works and approvals before they reach site.

Safe sequence

Connect excavation, plant, lifting, access and reinstatement in the order they occur.

Visible control

Assign inspections, permits, exclusion zones, briefings and stop-work triggers.